Beambrace / Client portal
Your frame, floor by floor, online
One place for your project: progress on every floor, the current drawings, open questions and the record of every pour. Click around the preview below.
Residential block, 9 floorsBeam and slab frame, full frame contract
Select a floor
Frame progress
51% complete
26 Novnext pour, floor 5
480 m³concrete poured
1 openquestion
Floor 5
- Status
- Stage 5 of 9: top bars and sleeves
- Pour
- Planned 26 Nov 2026
- Volume
- —
- Pre-pour inspection
- Booked 25 Nov
Preview with sample data. Clients see their own project here.
What you get with the portal
Less phoning the site to ask where things stand.
Live floor status
Which stage each floor is at, and the date of the next pour.
One drawing register
Every revision with its status, so the crew never builds from a superseded sheet.
Questions with answers
Site questions logged with photos, who answered and when.
Pour records
Volumes, slump, test samples and results for every slab, ready for handover.